VKU‑486 / FRAME PRODUCTION DEPARTMENT
Frame Production Ledger
Department for the Standardization of Visible Reality.
Left column: what happened. Right column: what was supposed to.
They moved the frame. Its cause stayed where it was.
Recording frames and control inputs
File the frame before the keypress on the left, the key in the center column, and the consequences on the right. Do not reorder the sheets. Last week the automaton learned to fall into a pit before pressing Back. The report called this an anticipatory response.
Set aside one entire unfamiliar corridor for inspection. Half of a familiar corridor does not qualify. The machine already knows where the door is and is only pretending to have worked it out.
Do not discard spoiled frames. The commission would like to see what actually happened.