Capabilities with clear boundaries.

The scope depends on the part, equipment and available inputs. Fixtures, routing and inspection require different decisions but should be designed together.

01 / FIXTURES

Locating and clamping

Review access to the part, loading sequence and machine constraints. The discussion produces an agreed concept, not an arbitrary collection of components.

02 / ROUTING

Operation sequence

Connect operations, intermediate datums and inspection points. Record assumptions that require verification on the shop floor.

03 / INSPECTION

Acceptance criteria

Clarify measurable parameters, available instruments and when to inspect. Agree criteria before releasing documentation.

Agree these points first

Model and drawing formats, applicable standards, verification responsibility and documentation deliverables. Certification, manufacture and testing are not automatically included.

Outline a task

Industry Grid / Fixtures, routing, inspection